logo IPPC
      FAQ            Log in

 

Member consultation on draft specifications starts

The draft specifications going for MC can be downloaded from the OCS. This consultation period is for 60 days: 1 June 2013 to 31 July 2013. The deadline for submission of member comments is 31 July 2013.

Type: Consultation